COGENERATION PROJECTS


Cangzhou Power Plant – Project Manager for the Owners Engineer Report. Ebasco Services Incorporated was retained by Entergy Power Group to provide an engineering review of the cogeneration addition to the Cangzhou Power Plant located in Cangzhou City, Hebei Province, China.  The cogeneration facility addition would consist of three pulverized coal (PC) fired boilers generating steam through two 12 MW nominal (15 MW maximum) backpressure steam turbine generators to 13 factories at various locations in the city.

Sweeny Cogeneration Project – Project Manager for a 250 MW cogeneration project conceptual design for Enserch Development Corporation and Houston Industries Energy, Inc. at the Philips Petroleum Plant in Sweeny, TX.  The power sales agreement would be with Houston Lighting and Power.  The work included preparing conceptual designs for various cogeneration configurations and associated capital cost estimates. Prepared and made the project technical presentation to Philips Petroleum.

US Gypsum – Manager of Engineering for a 60 MW cogeneration project conceptual design for Enserch Development Corporation at the US Gypsum facility in Jacksonville, Florida. The power sales agreement would be with Jacksonville Electric Authority.  The project would supply CTG exhaust gas to US Gypsum for drying gypsum board.  The work included preparing conceptual designs for various cogeneration configurations and associated capital cost estimates.

BPC Generating Station – Project Engineer for the conceptual design of an 80 MW coal-fired circulating fluidized bed power plant.  The work included preparing conceptual designs, heat balances and capital cost estimates.

St. Marys Cogeneration Project – Project Engineer for a 65 MW combined cycle cogeneration and waste wood fired plant located at the St. Marys Paper Company mill in Sault Ste. Marie, Ontario, Canada.  The project includes a 50 MW CTG and a 10 MW back pressure STG. Responsible for the engineering coordination with the paper mill engineering staff, interconnecting electric utility engineering staff and the Ontario Ministry of the Environment.

International Falls Cogeneration Project – Project Engineer for the feasibility study for a gas fired boiler and 45 MW condensing steam turbine-generator expansion to the Boise Cascade paper mill located in International Falls, Minnesota.  Responsible for preparation of the project conceptual design and capital cost estimate.  Provided engineering coordination with the interconnecting electric utility engineering staff and the paper mill engineering staff.

Fort Frances Cogeneration Project – Project Owner's representative for the 90 MW cogeneration project located at the Boise Cascade paper mill in Fort Frances, Ontario, Canada.  The project includes a 45 MW Westinghouse B-12 prototype CTG and a 45 MW condensing STG. Assisted in the development of financial models (pro-forma).  Attended project meetings and provided the Owner with technical advice during the conceptual plant design and major equipment selection.  Provided additional engineering staff to the project for the detailed review of the instrumentation and control design.

Texaco Cogeneration Project – Project Manager for the Texaco Anacortes Refinery 40 MW Cogeneration Project feasibility study for Mission Energy Company.  The study included preliminary selection of the combustion turbine cycle and identification of interface points with the refinery's gas system and powerhouse steam, feedwater and computer control system.

AGRICO Cogeneration Project – Project engineer for a 26 MW combined cycle cogeneration project.  Supervised the preparation of the project heat balances, layouts, and final designs.

Arco Cogeneration Project – Project engineer for the conceptual design and cost estimate of a 70 MW cogeneration project.  The project would use either a GE Frame 6 or a BBC Type 8 gas turbine-generators

Union Carbide Seadrift Cogeneration Project – Lead engineer for the preliminary design of the 100 MW combined cycle cogeneration project.  Responsible for the preparation of the project system flow diagrams.  The project used GE Frame 6 and Frame 7 combustion turbine-generators.

FMC Cogeneration Study – Provided the design review of two heat recovery steam generators on the coke plant stacks.  Steam from the HRSG would power a 10 MW steam turbine-generator.

Oregon State University Gasifier Study – Technical reviewer for a 10 MW combined cycle power plant with a wood gasifier as the primary energy source.  High temperature gas from the gasifier provided heat through a ceramic lined heat exchanger to an unfired combustion turbine-generator unit.

Wind River Nursery Project – Lead Mechanical Engineer for the conceptual design of a wood fired gasifier supply low Btu gas to diesel engine-generators.  The study included evaluation of heat recovery and thermal storage methods for nursery greenhouse heating.

California Energy Resource Commission -- Lead Mechanical Engineer for a study to recover heat from diesel-generator exhausts to produce low pressure steam and hot water for food processing plants.  The study included the preliminary selection of diesel engine-generators and the preparation of energy balances to match the existing facilities electric, steam, and hot water demands.